Langshot Stud, Surrey
Posted on 1st April 2019
Project: Work large stable block, Access road and car parks, horse walker and lunge arena. Acting as principal contractor design and build...
Read Article >
Please find posts below.
Langshot Stud, Surrey
Posted on 1st April 2019
Project: Work large stable block, Access road and car parks, horse walker and lunge arena. Acting as principal contractor design and build...
Edmonton
Posted on 1st April 2019
Phase 1: Works started to the largest ground beams we’ve ever constructed! With over 1800m3 of concrete and 240ton of reinforcement. Our...
Bracknell
Posted on 1st April 2019
Mass fill foundations 480m3 to dig and pour. Due to bad soils and groundwater, dig and pour was completed in phases. 280m3...
North London
Posted on 1st April 2019
Duct pits excavated to 2.6m deep. Tidy benching completed for earthwork support. X4 225mm thick reinforced concrete duct pits to take over...
Henley On Thames, Oxfordshire
Posted on 17th December 2018
Construction of a new Polo Equestrian Centre. Our package including major earthworks, highway spec roads & car parks, drainage, foundations and hard...
Blandings, Wentworth
Posted on 17th August 2018
Contract – 3 Large basements for a prestigious private dwelling Demolition Bulk excavation 12,500m3 Muckaway excavated material 10,000m3 Dewatering down to 6...
Lynwood, Camberley
Posted on 17th August 2018
Contract – Access Road & Large Curved Gabion Retaining Wall Site clearance removing tree stumps topsoil strip the whole site Cut &...