Bracknell
Client
RJ Leighfield
Area
Ascot
Services
Bulk Excavation
- Mass fill foundations 480m3 to dig and pour. Due to bad soils and groundwater, dig and pour was completed in phases.
- 280m3 concrete in the ground.
- Large attenuation tank completed, sheet piling works being carried out, foul and storm drainage connections being completed.
- Works progressing well at Bracknell, retaining wall foundation being excavated and blinded ready for reinforcement.