Lynwood, Camberley

Client

Bagshot Developments Limited

Value

240k

Area

Ascot

Services

Bulk Excavation


Contract – Access Road & Large Curved Gabion Retaining Wall

Site clearance removing tree stumps topsoil strip the whole site
Cut & fill 3500m3 of excavated sand Gabion retaining wall faced with limestone Access road 200m to adoptable standards Pumping station

Rising Main 150m Macadam surfacing Hard Landscaping

What we did:

Worked closely with the main contractor at pre-tender to value engineer and programme the project. J&A Groundworks designed the gabion wall saving the client time and money we managed to reduce the cost of the retaining wall and the programme of the works to just 12 weeks.