Edmonton

Client

H Sweet Ltd

Area

Maidenhead

Services

Bulk Excavation


Phase 1:

  • Works started to the largest ground beams we’ve ever constructed!
  • With over 1800m3 of concrete and 240ton of reinforcement.
  • Our first concrete pour 350m3 signed off in phase 1.
  • Over 90 ton of rebar in the ground and 40 bolt packs.
  • HYRIB permanent metal stop ends installed.
  • The first of six 300m3 pours to the internal foundations.

Phase 2:

  • Excavation and blinding started ready for another 90t of rebar and 700m3 of concrete.
  • Steel frame and composite decking started before we can continue
  • Complete 4000m2 of power floated concrete floors.
  • The first pour to phase 2 336m3. Duct pit slabs constructed ready for waterproof concrete.