Edmonton
Client
H Sweet Ltd
Area
Maidenhead
Services
Bulk Excavation
Phase 1:
- Works started to the largest ground beams we’ve ever constructed!
- With over 1800m3 of concrete and 240ton of reinforcement.
- Our first concrete pour 350m3 signed off in phase 1.
- Over 90 ton of rebar in the ground and 40 bolt packs.
- HYRIB permanent metal stop ends installed.
- The first of six 300m3 pours to the internal foundations.
Phase 2:
- Excavation and blinding started ready for another 90t of rebar and 700m3 of concrete.
- Steel frame and composite decking started before we can continue
- Complete 4000m2 of power floated concrete floors.
- The first pour to phase 2 336m3. Duct pit slabs constructed ready for waterproof concrete.