Blandings, Wentworth

Client - Zone Developments Limited

Value - 1.4 million

Duration - 12 months

Contract – 3 Large basements for prestigious private dwelling

Demolition
Bulk excavation 12,500m3
Muckaway excavated material 10,000m3 Dewatering down to 6 metres deep Deep Drainage
Pumping station for Foul/Surface Water Steel fixing 200 tonnes reinforcing Traditional and Polystyrene Formwork Sika waterproof concrete 1200m3
3no Large Soakaways

What we did:

Close liaisons with our client at the pre-contract stage undertaking pre-measures and value engineering to achieve the desired budget. Final account agreed with the client well in advance of practical completion.