Farnborough
Posted on 6th December 2019
3 weeks of progress in Farnborough, we have exposed most of the existing services. Sheet piling and bulk excavation starting next week.
Read Article >
Please find posts below.
Farnborough
Posted on 6th December 2019
3 weeks of progress in Farnborough, we have exposed most of the existing services. Sheet piling and bulk excavation starting next week.
Langshot Stud, Surrey
Posted on 1st April 2019
Project: Work large stable block, Access road and car parks, horse walker and lunge arena. Acting as principal contractor design and build...
Bracknell
Posted on 1st April 2019
Mass fill foundations 480m3 to dig and pour. Due to bad soils and groundwater, dig and pour was completed in phases. 280m3...
North London
Posted on 1st April 2019
Duct pits excavated to 2.6m deep. Tidy benching completed for earthwork support. X4 225mm thick reinforced concrete duct pits to take over...
Dartford, Kent
Posted on 17th December 2018
What We Did: Acted as the principal and groundworks contractor. Broke out a large area of the external concrete yard. Piling work for...
Lynwood, Camberley
Posted on 17th August 2018
Contract – Access Road & Large Curved Gabion Retaining Wall Site clearance removing tree stumps topsoil strip the whole site Cut &...